Choose a shed location.
Creating a level base for a shed.
There are a number of different options to create the necessary flat and level surface and we re going to take you through four of them.
Now you have a level base to place your shed on.
A timber base also known as a portabase a plastic base.
How to build a slab shed base 1.
Gravel is an easy solution for a shed base and works well with small to medium sized storage sheds particularly metal plastic and fabric ones.
You can leave the four pegs in position or remove later when your shed is erected.
To fine tune the level use a piece of 2 4 lumber.
Adjust the grade of the pad accordingly until it is level in all directions.
A foundation of pavers sits on leveled exposed ground or a sand base.
The bigger the paver the heavier it is but the fewer you need.
They provide a solid flat base upon which to build or set a shed and evenly support the floor.
Now that you ve chosen a location for your shed you re ready for step 2.
Insert a pencil at each side of the hole 6 inches down and remove any surplus soil that sits above the string until the base is level.
Decide where you will be placing your garden shed leaving enough space from hedges fences and.
Then attach a piece of string to two pencils to find out if your excavated base if level.
Mark our your base.
All are ideal to prevent water collecting around the shed floor and damaging it.
These four methods are how to lay.
If you have all the materials the process shouldn t take more than 2 hours depending on the size of your shed.
Dig a hole to a depth of at least 6 inches.
2 5 inch 7 cm to accommodate.
The stakes can be.
Screed and tamp the stone to exactly the top of the four reference points.
Need help leveling the ground for a shed.
Square and stake the corners.
Strip the topsoil and dig out to a depth of approx.
Leveling the ground is important for any storage building as it will help keep.
Thus if you have an 8 x 10 shed your stakes should be set to create a space that measures 10 x 12 feet.
Grab your favorite shovel it s that time again grab your gloves and favorite shovel.
On a level piece of ground mark out the corners of your gravel shed foundation allowing for at least 12 inches on each side.
Dig level off and rake the area.
An easy shed foundation for the beginner and good for prebuilt or a home built sheds.
Place the string level on the midpoint of each length of string to see if each section is level.
How to level the ground for a shed step 1.